Concrete Needed for a 20 × 24 Foot Slab (6 Inches Thick)
This estimate shows the concrete volume, bag count, and weight required for a 20×24×6″ driveway. All calculations include a 10% waste factor for subgrade irregularities and form flex. Adjust the waste factor and compare bag sizes using our interactive calculator below.
Material Estimate for 20×24×6″ Driveway
| Measurement | Value |
|---|---|
| Surface Area | 480.00 sq ft |
| Slab Thickness | 6 in |
| Concrete Volume (before waste) | 8.89 cu yd |
| Concrete Volume (with 10% waste) | 9.78 cu yd |
| 80lb Bags Needed | 440 bags |
| 60lb Bags Needed | 587 bags |
| 50lb Bags Needed | 704 bags |
| 40lb Bags Needed | 880 bags |
| Estimated Total Weight | 39,600 lbs |
Cost Estimate
Estimated material costs based on national averages. Prices vary by region and supplier.
| Option | Est. Cost Range |
|---|---|
| Ready-Mix Concrete Delivery | $1,223–$1,712 |
| 80lb Bags (440 bags) | $3,300 |
| 60lb Bags (587 bags) | $3,522 |
Costs exclude tax, delivery fees, and labor. Verify current pricing with local suppliers.
How the Estimate Works
The concrete volume is calculated using the standard formula for a rectangular prism:
A 10% waste factor is applied to account for subgrade irregularities, form flex, and spillage: 9.78 cu yd total. Bag calculations use standard yields: 80lb bags yield 0.6 cu ft, 60lb yield 0.45 cu ft, 50lb yield 0.375 cu ft, and 40lb yield 0.3 cu ft.
Customize This Estimate
Adjust the waste factor, compare bag sizes, or switch between imperial and metric units.
Open Interactive Concrete CalculatorFrequently Asked Questions
How much concrete do I need for a 20×24 slab 6 inches thick?
A 20 ft by 24 ft concrete slab at 6 inches thick requires approximately 9.78 cubic yards of concrete (including a standard 10% waste factor). This equals about 8.89 cubic yards before waste. The surface area of the slab is 480.00 square feet. Use our interactive Concrete Slab Calculator to customize your waste factor and bag size for a more precise estimate.
How many 80lb bags of concrete for a 20×24×6″ driveway?
For a 20×24×6″ driveway, you will need 440 bags of 80lb concrete mix. If you prefer other bag sizes, you would need 587 bags of 60lb mix, 704 bags of 50lb mix, or 880 bags of 40lb mix. An 80lb bag yields approximately 0.6 cubic feet of mixed concrete. For small projects, bagged concrete is cost-effective; for larger pours, consider ready-mix delivery. Use our calculator to compare bag sizes and costs.
What is the formula for calculating concrete for a 20×24 slab?
The formula is: Volume (cu yd) = (Length × Width × Thickness in feet) ÷ 27. For a 20×24 slab at 6 inches: (20 ft × 24 ft × 0.50 ft) ÷ 27 = 8.89 cubic yards. Add 10% for waste and subgrade irregularities: 9.78 cubic yards total.
How much does concrete cost for a 20×24×6″ driveway?
For a 20×24×6″ driveway, ready-mix concrete typically costs $125 to $175 per cubic yard delivered, totaling $1,222.50 to $1,711.50 for concrete alone. Using 80lb bags at approximately $7.50 each, bagged concrete would cost about $3,300.00 plus tax. For projects under 2 cubic yards, bagged concrete is often cheaper since you avoid the ready-mix minimum delivery fee of $100 to $150.
Related Guides & Resources
Concrete Slab Thickness Guide: Patios, Driveways, and Sheds
Learn the standard concrete slab thickness requirements for different projects. Find recommended thickness for driveways, patios, walkways, shed foundations, and RV pads.
Brick & Mortar Estimating Guide: How to Calculate Masonry Materials
Learn how to calculate the number of bricks and bags of mortar needed for brick walls, including standard and utility brick sizes.
How Many Concrete Bags for a 10x10 Slab? (4" & 6" Depths)
Calculate exactly how many 80lb or 60lb bags of concrete you need for a 10x10 slab. Includes formulas, waste factors, and thickness calculations.