Estimate the volume of concrete needed for rectangular pours like patios, sidewalks, and driveways. This professional estimator converts your dimensions into cubic yards, cubic feet, and the exact count of 40lb, 50lb, 60lb, or 80lb bags required, incorporating an adjustable waste percentage.

Slab Parameters

0% (Tight)10% (Std)30% (High)

Bag Size for Output

Cost & Labor Estimator

Estimated DIY Expense$482Based on 62 bags (80lb) at $7.20/ea (with 8% tax). Ready-mix: ~$347

DIY note: You save on contractor fees but need tools (wheelbarrow, floats, screed, shovel) and helper hands. 1 cubic yard requires ~45 bags of 80lb mix.

Local Store Price Match:Check Home DepotCheck Lowe's
Resale Valuation ROISource: Zonda CVV Report
67%Recoup

Backyard Patio Addition

Estimated Value Added:$324

ROI calculation matches a national midrange cost average. Actual return depends on local market conditions and finish quality.

Cost vs. Value © Zonda MediaView Local Reports
1
Calculate Surface AreaMultiply Length (10 ft) by Width (10 ft):
Area = 10 × 10 = 100.00 sq ft
2
Convert Thickness to Base UnitsConvert thickness (4 inches) to feet by dividing by 12:
Thickness = 4 ÷ 12 = 0.3333 ft
3
Compute Volume with WasteMultiply Area by converted Thickness, then apply the 10% safety margin:
Volume = 33.33 cu ft + 10% = 36.67 cu ft
4
Convert to Output UnitsDivide cubic feet by 27 to find cubic yards:
Cubic Yards = 36.67 ÷ 27 = 1.36 cu yd

Save Measurement

ℹ️ Measurements are stored locally on this device. Using Private/Incognito browsing or clearing browser cache will delete saved items.

Add to Project

💡 Did you know? Saving this calculation connects it to our Project Planner, allowing you to bundle multiple estimates (concrete, paint, tile, etc.) into a unified shopping list with shared measurements.

10.0Length (ft)10.0Width (ft)4.0Thickness (in)

Results

Required Volume (incl. 10% waste)
1.36cu yd
Raw: 1.23 cu yd (36.7 cu ft)
Bags (80lb)
62bags
Dry Weight
5,500lbs
Material Logistics: Bag Stack50 Bags / Pallet
Total: 62 bags (80lb)

Requires 1 full pallet plus 12 loose bags.

Material Logistics: Ready-Mix TruckMax 10 cu yd / Truck
Truck 1: 14% full
Total Volume: 1.36 cu yd

Requires 1 concrete ready-mix truck in total.

Bags by Size

80 lb0.60 cu ft
62
60 lb0.45 cu ft
82
50 lb0.375 cu ft
98
40 lb0.30 cu ft
123

How to Calculate Concrete Slab Volume

Calculating the volume of concrete for a rectangular slab is a straightforward process of finding the volume of a three-dimensional box. Follow these three steps:

  1. Determine Area: Measure the length and width of the slab area in feet. Multiply them together to get the surface area in square feet:
    Area (sq ft) = Length (ft) × Width (ft)
  2. Convert Thickness: Slabs are measured for thickness in inches, but calculation requires feet. Divide your slab thickness (in inches) by 12:
    Thickness (ft) = Thickness (in) ÷ 12
  3. Calculate Volume & Yards: Multiply your area by your thickness in feet to get cubic feet. To get cubic yards (the standard industrial ordering unit), divide cubic feet by 27:
    Volume (cu yd) = [Area (sq ft) × Thickness (ft)] ÷ 27

Example Calculation

Let’s calculate the concrete requirements for a standard backyard patio that measures 10 feet long, 12 feet wide, and 4 inches thick:

  • Area: 10 ft × 12 ft = 120 sq ft
  • Thickness in Feet: 4 in ÷ 12 = 0.333 ft
  • Volume in Cubic Feet: 120 sq ft × 0.333 ft = 40 cu ft
  • Volume in Cubic Yards: 40 cu ft ÷ 27 = 1.48 cubic yards
  • Bags Needed (80lb): Since an 80lb bag yields 0.6 cu ft: 40 ÷ 0.6 = 67 bags

Common Mistakes in Slab Pours

Inaccurate estimates can result in structural failure or expensive rush delivery charges. Avoid these three common issues during preparation:

  • Forgetting to Account for Compaction: When pouring over sub-base sand or gravel, the weight of the wet concrete will push down into the base, increasing the required volume by 5% to 10%.
  • Excluding Formwork Expansion: Wooden forms flex outward under the hydrostatic pressure of wet concrete. Add a 10% waste buffer to account for minor bowing and grade irregularities.
  • Uneven Subgrade Depth: If the excavated dirt bed is not perfectly level, parts of your slab will be deeper than 4 inches, causing you to run short near the end of the pour.

Concrete Slab Cost Guide

Concrete slab costs (2026) range from $4 to $12 per square foot installed, depending on thickness, reinforcement, finish, and your region. Here is a breakdown of common project costs:

ProjectDimensionsCu YdEst. Cost
Patio10′ × 12′ × 4″1.5$580–$1,150
Driveway20′ × 24′ × 6″8.9$1,780–$3,560
Sidewalk3′ × 40′ × 4″1.5$480–$960
Shed Base8′ × 10′ × 4″1.0$320–$640

Pro tip: Ready-mix concrete costs $125–$175 per cubic yard delivered (2026). For pours under 1 yard, bagged concrete is typically cheaper despite the higher per-yard cost, since you avoid the minimum delivery fee ($150–$250).

Types of Concrete Slabs

Choosing the right slab type depends on your soil conditions, climate, and structural requirements:

Monolithic Slab (Floating Slab)
A single pour where the slab and thickened edge footing are cast together. Common in warm climates without deep frost. The slab "floats" on the ground, reinforced with rebar around the perimeter. Best for sheds, garages, and small structures.
Suspended Slab
Poured over a structural framework of beams and columns, not directly on grade. Used for multi-story buildings, balconies, and parking garages. Requires deeper engineering and thicker reinforcement with a minimum 6-inch thickness.
Stamped Concrete Slab
A standard 4-inch slab with an exposed-aggregate surface or textural pattern applied before curing. Costs $8–$15 per square foot but eliminates the need for separate paving materials. Popular for patios, pool decks, and walkways.

Reinforcement Options

Proper reinforcement prevents cracking and extends the life of your slab. Here are the standard methods:

  • Welded Wire Mesh (6×6 – W1.4/W1.4): The most common reinforcement for residential slabs. Lay the mesh on plastic chairs so it sits at mid-depth (2 inches from the bottom of a 4-inch slab). Cost: $0.25–$0.50 per square foot.
  • Rebar (#3 or #4): For driveways and load-bearing slabs, use #3 (⅜-inch) or #4 (½-inch) rebar in a 24-inch grid pattern. Rebar provides superior tensile strength compared to mesh. Cost: $0.50–$1.00 per square foot.
  • Fiber Mesh (Synthetic Fibers): Mixed directly into the concrete, millions of microscopic fibers control thermal and shrinkage cracking. Not a replacement for wire mesh or rebar in structural applications. Cost: $0.10–$0.20 per square foot.

Frequently Asked Questions

How do you calculate concrete slab volume?

Multiply length (in feet) by width (in feet) to find the surface area in square feet. Then, convert your thickness from inches to feet by dividing by 12. Multiply the surface area by this thickness in feet to get the volume in cubic feet. Finally, divide by 27 to convert cubic feet to cubic yards.

How many 80lb bags of concrete are in a cubic yard?

A standard 80lb bag of concrete yields approximately 0.6 cubic feet of mixed concrete. Since there are 27 cubic feet in one cubic yard, you will need 45 bags of 80lb concrete mix to make one full cubic yard.

How thick should a concrete shed slab be?

A standard concrete slab for a backyard tool shed or residential walkway should be 4 inches thick. For heavy-duty driveways or heavy equipment, a thickness of 5 to 6 inches is recommended along with rebar reinforcement.

How much is a yard of concrete?

A cubic yard of concrete delivered by a ready-mix truck typically costs between $120 and $170, depending on the strength (PSI rating), regional rates, and delivery distances. For smaller projects using our Concrete Slab Calculator, mixing bags is often more cost-effective; for larger jobs, ready-mix delivery incurs a minimum load charge of $100 to $150 if ordering under 4 or 5 cubic yards. Additional add-ons like fiber mesh reinforcement or acceleration admixtures will increase the cost by $5 to $15 per cubic yard.

How long does concrete take to dry?

Concrete typically takes 24 to 48 hours to dry enough for foot traffic, but curing is a chemical process (hydration) that takes 28 days to reach full structural strength. Slabs are usually safe for light vehicular traffic or framing after 7 days. Keeping the slab moist during the first 7 days of curing is essential to prevent cracking and ensure maximum density. Use our concrete slab calculator to estimate the volume first, and plan to keep off the poured surface for the first 24 hours minimum.